During a workover operation in Pozo Cerro Verde (TD: 2,850 m), the operator experienced unexpected pressure spikes while circulating out gas influx.
Wellhead pressure: 1,450 psi (unstable).
Annular returns: erratic, indicating poor pressure control.
Existing equipment: aging 10k BOP stack, limited choke manifold capacity. The situation posed high risks of kick escalation and well control incident.